Ship machines to Europe without the paperwork panic.
Ready-to-edit declaration templates, a technical file index and a 46-point Directive-to-Regulation gap checklist, each line tied to the Article or Annex it comes from. Built by a mechanical design engineer for small machine builders.
Machines placed on the EU market from that date need declarations under the new Regulation.
Everything a small builder needs, nothing it does not
One-off purchases. Plain files you own and edit. Each product page lists exactly what is inside.
Machinery Regulation 2023/1230 Kit
For builders selling into the EU, Northern Ireland or GB (CE route).
- EU declaration of conformity template (Annex V Part A)
- Declaration of incorporation template (Annex V Part B)
- Annex IV technical file index and Annex III EHSR table
- 46-point gap checklist and digital-instructions checks
£79one-off · 7 files
See insideNon-EU Exporter Add-on
For builders outside the EU who ship machines to EU customers.
- Exporter organiser: EU operator, importers, documents
- Authorised representative mandate: content skeleton
- Three request letters to your EU importer or distributor
- Start-here note on the roles
£29one-off · 4 files · kit + add-on £99
See insideMachine Builder Project Toolkit
For small builders who run projects in spreadsheets.
- BOM cost roll-up
- RFQ and purchase-order tracker
- Quote calculator
- FAT/SAT and design review checklists
£29one-off · 5 workbooks
See insideFAIR Lite
For machine shops and aerospace suppliers.
- AS9102 Rev C data fields in your browser
- Paste characteristics from Excel
- Required-field completeness check; the inspector decides accept/reject
- Clean PDF report; nothing is uploaded
FreePro $9/mo or $90/yr
Open FAIR LiteFrom checkout to updated paperwork in an afternoon
Buy securely
Pay by card through Stripe. You are asked for your business name; we sell to businesses only.
Download instantly
You land straight on a private download page with your files. Stripe emails your receipt.
Work through your machines
Start with the guide, run the gap checklist per machine, then update your declarations and technical file.
What changes, and when
Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC. It applies in all EU Member States and in Northern Ireland under the Windsor Framework.
Machines placed on the market under the Directive before that date may still be made available afterwards (Article 52(1)). Machinery placed on the market or put into service from 20 January 2027 needs an EU declaration of conformity under the Regulation (partly completed machinery: a declaration of incorporation), unless the product is outside its scope.
- 29 June 2023Regulation (EU) 2023/1230 published in the Official Journal (OJ L 165).
- NowNo grace period for new units: check every machine you will place on the market from the date.
- 20 January 2027The Regulation applies; Directive 2006/42/EC is repealed.
- By 2 August 2028Delegated acts adding AI-related requirements to Annex III (required by Regulation (EU) 2026/1744) must apply; they have not yet been adopted.
Plain-English answers, with the Article numbers
Short guides written for engineers who have to sign the declaration.
Machinery Regulation 2023/1230 guides
Free guides, each citing the Article or Annex it relies on: Regulation vs Directive 2006/42/EC · Scope and exclusions (Article 2) · Transitional provisions and 20 January 2027 (Article 52) · Manufacturer obligations (Article 10) · Conformity assessment and Annex I high-risk machinery · Annex III essential requirements list · Risk assessment · Harmonised standards (Article 20) · Technical file (Annex IV) · EU declaration of conformity contents · Partly completed machinery and declaration of incorporation · CE marking (Articles 23-24) · Digital instructions for use · Protection against corruption and software · Substantial modification (Article 18) · Importers and authorised representatives · Distributors (Article 15) · US and other non-EU manufacturers · UK and Northern Ireland machine builders · Market surveillance and penalties · all guides
Need an engineer, not a template?
Proxom Engineering Ltd also takes products from concept to manufacture for clients.
Before you buy
Who are the kits for?
Small and mid-size machine builders, workshops and aerospace suppliers. We sell to businesses only.
Do I get the files immediately?
Yes. After payment you are sent to a private download page with the files. Stripe emails your receipt.
Are the kits legal advice?
No. They are templates and checklists prepared by a mechanical design engineer. You remain responsible for your conformity assessment.
Can I pay in US dollars?
Prices are set in pounds sterling. Stripe checkout shows the amount in your local currency where available, and your card provider converts the payment.
What does FAIR Lite cost?
The tool is free to use in your browser. Pro (no watermark, unlimited saved reports) is $9 per month or $90 per year; cancel by email.
Refunds?
See the terms and refunds page. If a file does not open or is not as described, email us and we will fix it or refund it within 30 days (kits only; FAIR Lite Pro terms are in the terms page).
More questions? kits@proxom.co.uk
61 days to 20 January 2027.
Start with the gap checklist for £9 and see where each of your machines stands today.